FlowmageDocs

Create Planner task

BetaChanges data

Adds a task to a Planner plan, with its bucket, people and due date.

Settings

SettingWhat it is
ConnectionRequiredThe Microsoft Graph connection the step signs in with.
Plan idRequiredtext
TitleRequiredtext
Bucket idThe column the task goes in — it must belong to the plan.
Assign toUser object ids, comma-separated — the id Get user answers.
StartsISO 8601 in UTC.
Duetext
Priority"" or "urgent" or "important" or "medium" or "low"
Technical details
KeyValue
connectiontexta connection id from `requires.connections` (provider `microsoft-graph`)
planIdtext
titletext
bucketIdtext
assignTotext
startDateTimetext
dueDateTimetext
priority"" or "urgent" or "important" or "medium" or "low"

Output

FieldType
idTask idstring
etagETag — what Update Planner task checks againststring
taskobject
Sample output, and the expression for each field
  • etag"W/\"JzEt\""
  • id"1"
  • task
    • id"1"
    • title"Update client list"

Errors

When a step of this node stops a run, the run page shows a code. Look it up:

Example step

The step as a flow file holds it. Replace each value in <…>.

{
  "config": {
    "assignTo": "",
    "bucketId": "",
    "connection": "<connection id>",
    "dueDateTime": "",
    "planId": "<plan id>",
    "priority": "",
    "startDateTime": "",
    "title": "<title>"
  },
  "label": "Create Planner task",
  "type": "graph.createPlannerTask",
  "version": 1
}