FlowmageDocs

Add task to project

BetaChanges data

Adds an existing Asana task to another project.

Settings

SettingWhat it is
ConnectionRequiredThe Asana connection the step signs in with.
Task idRequiredtext
Project idRequiredThe project to add the task to.
Technical details
KeyValue
connectiontexta connection id from `requires.connections` (provider `asana`)
taskIdtext
projectIdtext

Output

FieldType
addedboolean
Sample output, and the expression for each field
  • addedtrue

Errors

When a step of this node stops a run, the run page shows a code. Look it up:

Example step

The step as a flow file holds it. Replace each value in <…>.

{
  "config": {
    "connection": "<connection id>",
    "projectId": "<project id>",
    "taskId": "<task id>"
  },
  "label": "Add task to project",
  "type": "asana.addTaskToProject",
  "version": 1
}